Skip to main content

Procedure for Evacuation of Critical Injured Personnel

  1. Make the area around the injured person safe to prevent further injuries.
  2. Ensure that the respiratory passage is open.
  3. If unconscious, with loss of respiration, loss of heartbeat, give first aid, such as artificial respiration and heart compression. (CPR)
  4. Stop serious bleedings. (Apply Pressure Bandages )
  5. Keep the injured warm. (TPA or Warm Blanket)
  6. Do not move him unless he is in a position of danger.
  7. The following parties must be notified immediately:                           i. Head office (D.P.A) - who will contact P & I club.                          ii. Maritime rescue coordination centre (MRCC) - who will contact shipping and other sources of assistance in the vicinity.   iii. AMVER (Automated Mutual-Assistance Vessel Rescue System) - who will provide assistance and information regarding vessels in the vicinity with qualified medical personnel on board.                                                                                                                    iv. MEDICO - Doctor's advice by radio can be obtained.
  8. Information to be provided to any source of medical assistance:
i. Name, age and sex of patient
ii. Vital signs - breathing frequency, temperature, pulse and blood pressure
iii. Description of the injury or symptoms of the illness
iv. Medical history of the patient, if considered relevant
v. Description of any treatment given on board
vi. Whether the patient can walk
vii. Position, course, and speed of the ship
viii. ETA next port / nearest harbor (port of refuge)
ix. Weather conditions in the area (wind direction/force, visibility, wave height)

Comments

Popular posts from this blog

Difference Between A, B & C-Class Divisions?

IMO Symbol A Class Division  IMO Symbol B Class Division  SOLAS has tables for structural fire protection requirement of bulkheads and decks. The requirements depend on the spaces in question and are different for passenger ships and cargo ships. The Administration has required a test of a prototype bulkhead or deck in accordance with the Fire Test Procedures Code to ensure that it meets the above requirements for integrity and temperature rise. Types of Divisions: "A" Class "B" Class "C" Class "A" Class: "A" class divisions are those divisions formed by bulkheads and decks which comply with the following criteria: They are constructed of steel or equivalent material They are suitably stiffened They are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. they are insulated with approved non-combustible materials such that the average tempera

Bilge Injection Valve

Bilge Injection is a valve that enables the engine room bilges to be pumped out directly overboard in the event of an emergency such as flooding. The valve is normally fitted to the end of a branch connection with the main sea water suction line. This enables large main seawater cooling pumps to be used as a bilge pump in an emergency. Emergencies like fire and flooding involve the use of seawater. If there is a fire, seawater is the biggest resource of water available in the sea. Similarly, if it involves flooding of the engine room, cargo spaces or any other place on the ship for that matter; you would again require pumping the sea water out of the ship. In both these cases, you require pumps.  There are two valves in close proximity namely main injection valve and bilge injection valve. Both of them have their own independent controls. The diameter of the bilge injection valve is kept nearly 66% of the main valve diameter which draws water directly from the sea through the

Load Line & Why it is Important

Merchant ships have a marking on their hull know as the Plimsoll line or the Plimsoll mark, which indicates the limit until which ships can be loaded with enough cargo, internationally, the Plimsoll line on a ship is officially referred to as the international load line. Every type of ship has a different level of floating and the Plimsoll line on a ship generally varies from one vessel to another.  All vessels of 24 meters and more are required to have this Load line marking at the centre position of the length of summer load water line. There are two types of Load line markings:- Standard Load Line marking – This is applicable to all types of vessels. Timber Load Line Markings – This is applicable to vessels carrying timber cargo. These marks shall be punched on the surface of the hull making it visible even if the ship side paint fades out. The marks shall again be painted with white or yellow colour on a dark background/black on a light background.  The comp