How to Find an Earth Fault On Board Ship?

Earth fault is considered very critical on board a ship. Some ships which operate at 440V do not have any trip attached for a single earth fault. However when the operating voltage exceeds 3000V. It is mandatory to have protection system which isolates when a machinery suffers an earth fault.

The seriousness of the action to be taken on an Earth fault depends on the part of the electrical system it affects. Conventional ships which operate on 3 Phase, 440V have earth fault indicators installed on all three phases. Any earth fault on a 440V system is considered to be a serious trouble and immediate action is required to identify the faulty circuit. Any earth fault on 220V or any low voltage lighting circuit can be considered as important but need not required immediate attention. However, attention should be paid at the next earliest opportunity.




Finding Earth Fault on 440V circuit
Whenever there is an earth fault alarm, immediately inform to electrical officer. First action is to check the trueness of the alarm. Usually there will be a test button which when pressed resets the alarm and checks the condition of the earth fault.

If the ship is having IAS(Integrated Automation System) check on the computer in the list of the events after which the alarm has activated. If IAS facility is not available, there is only one option of the isolating each and every machinery in the 440V circuit and check whether the earth fault indication returns back to normal. 

Isolation of all machinery, which operates on 440V is not always possible. Certain critical equipment like steering gear and lubricating oil pumps cannot be isolated for when the ship is underway. However changeover can be done from running machinery to the standby one and thus the earth fault can be found.


Finding Earth Fault on 220V Circuit
Finding an Earth on a 220V circuit is comparatively difficult than 440V circuit. The main reason being the lighting circuits found all round the vessel. However any earth fault alarm with respect to a 220V circuit is usually treated as important but not an emergency.

When a 220V earth fault alarms sounds, the trueness of the alarm is checked by pressing the test button and then investigation can be stared on each and every 220V circuit. 

Example: Earth Fault alarm sound on a 220V panel
  1. Check the trueness of the alarm
  2. Isolate the complete group start panel for a lighting division one by one
  3. Check the earth fault indicator for status.......still faulty or normal?
  4. If faulty, then put on the breaker which is put off earlier and isolate other group start panel for lighting circuit.
  5. Once the group start panel is identified, then individual lighting switches are turned off one by one and checked for the alarm condition.
  6. When any switch when turned off and thus the condition becomes normal then this lighting circuit marked and the inspection is done on the particular light for abnormalities.
Alternate Idea: Instead of turning off breakers one by one for the lighting circuit, turn off all lighting of a particular doubted area. This method helps usually when there are two or more earth faults in 220V light circuit. By turning off all the breakers of a particular area, then switching on the breaker one by one will eliminate multiple earth faults.

When I turned off lighting switches one by one, it was difficult for us to identify multiple earth faults.

Once the particular faulty circuit is spotted, then we have to further break them into individual pieces and check them for earth faults. For this as usual, we use megger against earth.
By removing fuse of the two phase lines, each line can be tested and the fault pinned sown.


Comments

Popular posts from this blog

Difference Between A, B & C-Class Divisions?

IMO Symbol A Class Division  IMO Symbol B Class Division  SOLAS has tables for structural fire protection requirement of bulkheads and decks. The requirements depend on the spaces in question and are different for passenger ships and cargo ships. The Administration has required a test of a prototype bulkhead or deck in accordance with the Fire Test Procedures Code to ensure that it meets the above requirements for integrity and temperature rise. Types of Divisions: "A" Class "B" Class "C" Class "A" Class: "A" class divisions are those divisions formed by bulkheads and decks which comply with the following criteria: They are constructed of steel or equivalent material They are suitably stiffened They are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. they are insulated with approved non-combustible materials such that the average tempera

Bilge Injection Valve

Bilge Injection is a valve that enables the engine room bilges to be pumped out directly overboard in the event of an emergency such as flooding. The valve is normally fitted to the end of a branch connection with the main sea water suction line. This enables large main seawater cooling pumps to be used as a bilge pump in an emergency. Emergencies like fire and flooding involve the use of seawater. If there is a fire, seawater is the biggest resource of water available in the sea. Similarly, if it involves flooding of the engine room, cargo spaces or any other place on the ship for that matter; you would again require pumping the sea water out of the ship. In both these cases, you require pumps.  There are two valves in close proximity namely main injection valve and bilge injection valve. Both of them have their own independent controls. The diameter of the bilge injection valve is kept nearly 66% of the main valve diameter which draws water directly from the sea through the

Load Line & Why it is Important

Merchant ships have a marking on their hull know as the Plimsoll line or the Plimsoll mark, which indicates the limit until which ships can be loaded with enough cargo, internationally, the Plimsoll line on a ship is officially referred to as the international load line. Every type of ship has a different level of floating and the Plimsoll line on a ship generally varies from one vessel to another.  All vessels of 24 meters and more are required to have this Load line marking at the centre position of the length of summer load water line. There are two types of Load line markings:- Standard Load Line marking – This is applicable to all types of vessels. Timber Load Line Markings – This is applicable to vessels carrying timber cargo. These marks shall be punched on the surface of the hull making it visible even if the ship side paint fades out. The marks shall again be painted with white or yellow colour on a dark background/black on a light background.  The comp