Safety
  • What type cargo you carried.under which category does palm oil come (related to IBC code)
  • light weight,dead weight,collision bulkhead details etc.
  • P &A manual.
  • permeability meaning.
  • Freeboard assignment.
  • Purpose of Torsion box with sketch
  • Transverse section of container ship
  • Stresses on ship ( hogging, sagging, tensile, compressive)
  • State objective of Ism in detail.
  • Discharge criteria for sewage.
  • Special area for annex 1,4,5,6
  • Latest amendments in Annex 6

Motor
  • How many tie rod on your ship.why no tie rod in generator.tie rod function.
  • Heat exchanger expansion arrangements draw and show.
  • piston cooling of piston how it takes place explain.
  • cylinder head overhaul and pressure of opening nut.
  • TC sealing air why is provided were are location.lubrication of TC. Labyrinth sealing arrangement
  • Types of crankshaft. Explain construction of each type with sketch and material used
  • Iron-carbon phase diagram.
  • Drop test of exhaust valve
  • Draw tandem piston and state adv. and disadvantage of using it.
  • Draw and explain propeller curve.

Electrical
  • CT and VT. were used on ship.
  • How overcurrent is prevented.difference between overcurrent and overload trip.
  • Overhauling of motor what are check.
  • Draw how connect in star connection.
  • Draw and show how MSB is isolated from ESB as there is power in ESB.
  • Difference between home supply and ship supply
  • How will you measure voltage in 3 pin of your household socket with multimeter and what value you will get on multimeter.
  • what is LV and HV, Is 2000V d.c is high voltage ?
  • There is no marking (u1,v1...u2,v2... ) on six terminal of an old induction motor. how you will identify the two end of coils and connect it in delta. Explain through sketch.
  • Explain 3 phase neutral insulated and earthed system and there advantages.
  • Types of fault on circuit.
  • Difference between closed circuit and short circuit with help of numerical example
  • What is CCA?
  • How to check charge of a Lead Acid battery.

MEP
  • Why oil separator is fitted after LP side in refrigeration system.
  • Bumping clearance in compressor why imp how to measure what happens if it is more.
  • ME piston overhauling procedure.
  • how take butt clearance.how take butt clearance without removing piston i.e piston inside liner.clearances in piston ring.significance of clearance in first piston ring.
  • What is CPR how it works why it is given.
  • Centrifugal pump not developing pressure what you will check wear ring is good and all clearances are fine.
  • How to check trueness of bend pump shaft.
  • If shaft is bent and you have to use same shaft how you will use it.
  • Where to put shims in air compressor and its purpose. Draw and explain
  • Belt driven purifier clutch mechanism. Draw how clutch shoe is arranged in the same.
  • Type and purpose of accumulator in reciprocating pump. explain in full detail.

Comments

Popular posts from this blog

Difference Between A, B & C-Class Divisions?

IMO Symbol A Class Division  IMO Symbol B Class Division  SOLAS has tables for structural fire protection requirement of bulkheads and decks. The requirements depend on the spaces in question and are different for passenger ships and cargo ships. The Administration has required a test of a prototype bulkhead or deck in accordance with the Fire Test Procedures Code to ensure that it meets the above requirements for integrity and temperature rise. Types of Divisions: "A" Class "B" Class "C" Class "A" Class: "A" class divisions are those divisions formed by bulkheads and decks which comply with the following criteria: They are constructed of steel or equivalent material They are suitably stiffened They are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. they are insulated with approved non-combustible materials such that the average tempera

Bilge Injection Valve

Bilge Injection is a valve that enables the engine room bilges to be pumped out directly overboard in the event of an emergency such as flooding. The valve is normally fitted to the end of a branch connection with the main sea water suction line. This enables large main seawater cooling pumps to be used as a bilge pump in an emergency. Emergencies like fire and flooding involve the use of seawater. If there is a fire, seawater is the biggest resource of water available in the sea. Similarly, if it involves flooding of the engine room, cargo spaces or any other place on the ship for that matter; you would again require pumping the sea water out of the ship. In both these cases, you require pumps.  There are two valves in close proximity namely main injection valve and bilge injection valve. Both of them have their own independent controls. The diameter of the bilge injection valve is kept nearly 66% of the main valve diameter which draws water directly from the sea through the

Load Line & Why it is Important

Merchant ships have a marking on their hull know as the Plimsoll line or the Plimsoll mark, which indicates the limit until which ships can be loaded with enough cargo, internationally, the Plimsoll line on a ship is officially referred to as the international load line. Every type of ship has a different level of floating and the Plimsoll line on a ship generally varies from one vessel to another.  All vessels of 24 meters and more are required to have this Load line marking at the centre position of the length of summer load water line. There are two types of Load line markings:- Standard Load Line marking – This is applicable to all types of vessels. Timber Load Line Markings – This is applicable to vessels carrying timber cargo. These marks shall be punched on the surface of the hull making it visible even if the ship side paint fades out. The marks shall again be painted with white or yellow colour on a dark background/black on a light background.  The comp