Topping up the refrigerant

Gas needs to be charged in a fridge system only if the system is under charged. 

The safest and quickest method of adding refrigerant to a refrigeration system is to add the refrigerant through the charging valve as a liquid.

A refrigeration system should not be charged if there are leaks or if there is reason to believe that there is a leak in the system.

 The leaks must be found and corrected. 

A system should be checked for leaks immediately following, or during the process of charging.

Freon bottle needs to be weighed before and after charging gas to ascertain the quantity of gas charged.

A charging connection is fitted in way off the filter dryer.  This allows additional refrigerant to be introduced into the system via the dryer element.

The normal procedure is to shut the condenser liquid outlet valve. The compressor is now sucking from the system and delivering to the condenser where the gas liquefies and the liquid level begins to rise in the reservoir. 

The Freon gas bottle is now connected via a charging hose to the charging connection on the filter dryer, the air from the charging hose is purged by opening the gas bottle valve and then the hose union is tightened on the charging connection. 

The liquid valve on the gas bottle is opened and the compressor started, as the only gas entering the system is now coming from the charging line the compressor will suck this gas and send it to the condenser where it is liquefied, while the charging is on the refrigerant liquid level in the condenser is monitored, the charging is stopped when normal level in the condenser is achieved. 

The charging connection valve is now closed, the gas bottle outlet valve is closed the charging hose is removed and the condenser liquid line outlet valve is opened and compressor started.

Comments

  1. Great blog, thanks for explaining the steps to top up the refrigerant gas. Looking for more interesting blogs! R744 gas

    ReplyDelete

Post a Comment

Popular posts from this blog

Difference Between A, B & C-Class Divisions?

IMO Symbol A Class Division  IMO Symbol B Class Division  SOLAS has tables for structural fire protection requirement of bulkheads and decks. The requirements depend on the spaces in question and are different for passenger ships and cargo ships. The Administration has required a test of a prototype bulkhead or deck in accordance with the Fire Test Procedures Code to ensure that it meets the above requirements for integrity and temperature rise. Types of Divisions: "A" Class "B" Class "C" Class "A" Class: "A" class divisions are those divisions formed by bulkheads and decks which comply with the following criteria: They are constructed of steel or equivalent material They are suitably stiffened They are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. they are insulated with approved non-combustible materials such that the average tempera

Bilge Injection Valve

Bilge Injection is a valve that enables the engine room bilges to be pumped out directly overboard in the event of an emergency such as flooding. The valve is normally fitted to the end of a branch connection with the main sea water suction line. This enables large main seawater cooling pumps to be used as a bilge pump in an emergency. Emergencies like fire and flooding involve the use of seawater. If there is a fire, seawater is the biggest resource of water available in the sea. Similarly, if it involves flooding of the engine room, cargo spaces or any other place on the ship for that matter; you would again require pumping the sea water out of the ship. In both these cases, you require pumps.  There are two valves in close proximity namely main injection valve and bilge injection valve. Both of them have their own independent controls. The diameter of the bilge injection valve is kept nearly 66% of the main valve diameter which draws water directly from the sea through the

Load Line & Why it is Important

Merchant ships have a marking on their hull know as the Plimsoll line or the Plimsoll mark, which indicates the limit until which ships can be loaded with enough cargo, internationally, the Plimsoll line on a ship is officially referred to as the international load line. Every type of ship has a different level of floating and the Plimsoll line on a ship generally varies from one vessel to another.  All vessels of 24 meters and more are required to have this Load line marking at the centre position of the length of summer load water line. There are two types of Load line markings:- Standard Load Line marking – This is applicable to all types of vessels. Timber Load Line Markings – This is applicable to vessels carrying timber cargo. These marks shall be punched on the surface of the hull making it visible even if the ship side paint fades out. The marks shall again be painted with white or yellow colour on a dark background/black on a light background.  The comp